Quality — ISO 9001:2015
Your ISO 9001 system built in — NCRs, weld inspection, ITPs and mill certs per heat number. Audit-ready, not a spreadsheet buried on the shared drive.
Weld pass rate
96%
14 reworks
Q4 FY25/26
Open NCRs
3
1 holding dispatch
Welds inspected
342
Q4 FY25/26
Mill certs missing
2
before dispatch
Non-conformance register (NCRs)
| NCR | Job | Issue | Disposition | Raised | Status |
|---|---|---|---|---|---|
| NCR-2026-014 | Westmont Aged Care | Weld undercut on rafter GL-B3 (>0.5mm) | Grind out & re-weld, MPI re-test | 28 June 2026 | Open |
| NCR-2026-012 | Bunnings Wodonga Mezzanine | Mill cert missing for 410UB heat batch | Awaiting InfraBuild cert before dispatch | 24 June 2026 | Under Review |
| NCR-2026-011 | Lutheran Aged Care Expansion | Galv coating thickness below spec on handrail | Return to galvaniser for re-dip | 20 June 2026 | Open |
| NCR-2026-013 | Mazda Motor Showroom | Base plate BP-04 hole spacing 5mm out (detailing) | Re-drilled & re-checked — verified | 16 June 2026 | Closed |
| NCR-2026-010 | VSBA Wilmont School Bundle | Paint DFT below 125µm on 3 members | Additional topcoat applied & re-tested | 02 Feb 2026 | Closed |
ITP completion by job
Mill cert register (traceability)
- H-882041 On file
360UB44.7 Grade 300
Liberty Primary Steel · FW-2026-0137
- H-882110 On file
200UC46.2 Grade 300
InfraBuild Steel · FW-2026-0137
- H-884552 Awaiting
410UB53.7 Grade 300
InfraBuild Steel · FW-2026-0146
- H-885301 On file
20mm Plate Grade 350
Vulcan Steel · FW-2026-0151
- H-886740 Awaiting
UB/UC bundle
Liberty Primary Steel · FW-2026-0153